Install
- 148articles · 365d
- 3+ day agolatest article
- Sep 17, 2025earliest in window
- 89%with images
- 318avg words
- Transportation 145
- Travel & Transportation 136
- Economy, Business & Finance 68
- Disaster, Accident & Emergency Incident 55
- Arts, Culture, Entertainment & Media 5
- Education 4
- Human Interest 4
- Jobs & Education 4
Please confirm you are human
This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.
A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.
News
Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade
5+ mon, 5+ day ago (325+ words) Tuesday 7 Apr 2026 Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work…...
Network Rail and South Western Railway carrying out £6 million upgrade for Berrylands station in south west London
5+ mon, 1+ week ago (409+ words) Monday 30 Mar 2026 Station to close from 11 May until end of September so that platforms can be replaced and safety enhancements carried out. Berrylands station will close from Monday 11 May, until the end of September, for a £6 million programme of upgrades....
Strong progress on £4.5m upgrade at Stevenage station
5+ mon, 2+ week ago (352+ words) Thursday 26 Mar 2026 A £4.5 million upgrade of canopies and staircase roofs is currently underway at Stevenage station, along with the full renewal of all platform lighting. The four-month refurbishment is making strong progress and is planned for completion by the end…...
TWO WEEKS TO GO: Network Rail to carry out vital track upgrades between London Waterloo and Clapham Junction this Easter
5+ mon, 3+ week ago (329+ words) Friday 20 Mar 2026 A reduced service will operate between London Waterloo and Clapham Junction over the Easter Weekend, Friday 3 to Monday 6 April, while engineers carry out vital engineering work. Engineers will replace track at London Waterloo used by trains that run…...
Major rail upgrade plans submitted to help unlock new railway stations
5+ mon, 3+ week ago (530+ words) Wednesday 18 Mar 2026 Passengers are closer to benefitting from improved rail services, better connectivity and new stations as Network Rail submits a full business case for major railway upgrades between Cardiff Central and Severn Tunnel Junction. This March, Network Rail Wales…...
New £10m depot unveiled to maintain Manchester's railway for passengers
5+ mon, 3+ week ago (457+ words) Monday 16 Mar 2026 A £10m new rail maintenance depot has been unveiled to keep passenger and freight trains moving smoothly through Greater Manchester. The high-tech facility at Guide Bridge is the new home for over 120 Network Rail staff who work night and…...
Weekend engineering works to improve journeys on the Essex Thameside line
6+ mon, 3+ day ago (261+ words) Monday 9 Mar 2026 Network Rail will be carrying out essential maintenance on the Essex Thameside line over several weekends in April and May 2026 to keep the railway safe, reliable, and comfortable for passengers. Passengers planning to use c2c services during specific weekends…...
Essential track renewals to improve journeys between Newport and Cardiff
6+ mon, 3+ day ago (561+ words) Monday 9 Mar 2026 The railway between Newport and Cardiff Central will close from late on Friday 20 March, and remain closed throughout the weekend, while Network Rail completes vital upgrades to the South Wales Main Line, with buses replacing trains. Passengers travelling…...
More than nine in ten trains will run as normal this Easter – with engineering works set to take place in Kent and south east London
6+ mon, 3+ day ago (290+ words) Monday 9 Mar 2026 While most trains will operate as normal over the Easter weekend, essential engineering work will take place in Thanet, between Ashford and Dover, and in south-east London. Passengers are urged to plan ahead this Easter while essential engineering…...
EASTER WEEKEND: Network Rail to carry out essential maintenance of vital rail corridor in Eastleigh
6+ mon, 6+ day ago (355+ words) Friday 6 Mar 2026 This Easter weekend, from Friday 3 April to Monday 6 April, Network Rail will be carrying out essential maintenance work in the Eastleigh area, a vital corridor for passengers and freight. The line between Winchester and St Denys will be…...